Hybrid Heat Pumps for 26 Education Facilities

Air-to-water heat pumps, controls and backup circulation would improve heating resilience for 13 schools and 13 kindergartens.

Contact for this project

01

Agglomeration relevance

A 26-site urban package that can become a technical template for schools in other agglomeration communities.
This section is an editorial assessment of functional relevance. It does not change the project owner, beneficiary area or governance stated by the source.

02

Project dossier

The project in operational terms: the system it changes, the intervention logic, the path to delivery and the evidence still required for a responsible commitment.

01

The system behind the project

The project proposes hybrid air-to-water heat-pump systems for 13 schools and 13 kindergartens, combining controls, circulation and retained district-heat or backup support to improve heating resilience. Education facilities require stable indoor conditions, yet their envelopes, emitters, schedules and electrical headroom differ materially. The 26-site package is a city portfolio; its functional agglomeration value is a replicable audit, design and seasonal-verification method for other communities, not evidence that their buildings are included. Each site therefore needs its own measured load, hydraulic arrangement and electrical assessment.

02

How the intervention works

A building-specific hybrid design can reduce purchased heat while retaining district-heat and backup support; seasonal COP and cold-weather performance must be measured. Controls must coordinate heat pumps, district heat and circulation by outdoor temperature, demand and tariff while preventing simultaneous inefficient operation. Each building needs a heat-loss model, hourly load profile, emitter and hydraulic survey, district-heat interface, air-source unit selection, buffer and circulation design, electrical capacity check, controls sequence and backup mode. Defrost, condensate, noise, frost protection, metering and safe access must be resolved. Equipment COP points are not seasonal system performance.

03

From concept to an operable asset

Audit and meter a representative heating season, confirm indoor-condition requirements and complete building-specific designs before bundling procurement. Installations should be phased outside critical teaching periods where possible, with temporary heat and electrical contingencies. Commission hydraulic balance, controls, district-heat changeover, defrost and cold-weather capacity. Seasonal M&V must normalise weather and occupancy before savings and carbon forecasts are accepted. The source presents target sites and forecast savings, not completed installations or measured portfolio performance.

04

What must be proven before commitment

Due diligence for the heat-pump portfolio must verify building loads, envelope condition, emitter temperatures, network supply, electrical headroom, acoustic limits, refrigerant obligations, planning, fire safety and continuity for children. It should reproduce seasonal performance, backup energy, tariff, demand-charge, maintenance, replacement and CO₂ calculations at each site, then test budget, schedule and savings under severe-weather and outage scenarios. Every site must retain its own design temperatures, meter boundary, control narrative, commissioning record and seasonal performance report.

05

Where a partner can create value

Required capabilities include building energy auditing, HVAC and air-to-water heat-pump design, hydraulic balancing, district-heating interfaces, electrical protection and capacity studies, building controls, acoustic and structural review, refrigerant compliance, occupied-school installation, independent commissioning and seasonal M&V. Facility staff need training, alarms, manuals and spare-parts support. Designers and contractors must provide per-site calculations and coordinated responsibility for delivered indoor conditions. The lead designer should own hydraulic, electrical and control interfaces; separate equipment suppliers cannot leave integration failures to school staff.

03

How the project creates value

  1. NeedEducation buildings need predictable indoor conditions, yet heating and electricity remain vulnerable.
  2. InterventionA building-specific hybrid design can reduce purchased heat while retaining district-heat and backup support; seasonal COP and cold-weather performance must be measured.
  3. OutputsAir-to-water heat pumps, controls and backup circulation would improve heating resilience for 13 schools and 13 kindergartens.
  4. BeneficiariesA 26-site urban package that can become a technical template for schools in other agglomeration communities.
  5. Expected resultExpected effect: Air-to-water heat pumps, controls and backup circulation would improve heating resilience for 13 schools and 13 kindergartens.

04

Evidence dashboard

Project sites26Target
COP at +7 °C2.88-2.95Source fact
COP at −14 °C1.96-1.98Source fact
Annual savings352000Forecast
CO₂ reduction3300Forecast

European value lens

Healthy learning conditions, energy efficiency, child-centred investment and equal service quality.

05

Indicative launch scenario

The dates refresh automatically: the scenario begins on the first day of the next month and preserves the source-defined project duration and relative stage sequence.

Scenario start
Scenario completion
  1. 01

    Building heat-load and electrical design

  2. 02

    Heat-pump and control installation

  3. 03

    Seasonal testing and handover

Scenario dates support planning only. They are not evidence of an approved calendar, procurement or financing commitment.

06

Source identity and readiness

Customer
initiated by Kryvyi Rih City Council
Performer
Kryvyi Rih City Development Institution
Project year
2025
Readiness
preliminary development
Funding required
3,353 mln EUR
Source target term
12 months
Detail status
Active

07

Project context from the source

Optimised derivatives of the source project imagery; each asset retains its provenance.

08

Contact for this project

Support the next verified step of this project with technology, expertise, finance or partnership capacity.

This site collects no messages and stores no personal data. The button opens the original project page on the regional investment portal in a new tab, where the responsible team and its contact details are published.

Source captured and verified on 24 August 2026

Open original project page ↗