AGGLOMERATION PROJECT PORTFOLIO · 2026

Projects that turn shared pressure into shared capacity.

Thirty source-grounded investment and development proposals, reframed around their potential value for the Kryvyi Rih agglomeration without changing legal ownership, scope or readiness.

Essential systemsWater, heat and public infrastructure designed for continuity across the agglomeration.
Energy transitionEfficiency, distributed generation and industrial decarbonisation with measurable operating logic.
Productive renewalManufacturing, logistics, research and new ventures that diversify the regional economy.

Source snapshot: 24.08.2026 · invest.kr.gov.ua

Projects shown 30
Aerial farmland merging into a financial risk dashboard with weather layers and visible uncertainty bands.
Startups & innovationIn delivery

AgriLumen

AgriLumen — Climate and Market Risk Analytics

AgriLumen is an MVP-stage SaaS concept combining weather, satellite and market data to express farm risk in financial scenarios; model accuracy, crop coverage, data rights and customer evidence still require validation.

Funding required
390 тис. євро
Source target term
36 months
Open project dossier
Conceptual cutaway of buildings using passive windcatchers, with airflow paths shown as translucent blue ribbons.
Startups & innovationIn delivery

CatchWind

CatchWind — Passive Wind-Driven Ventilation

CatchWind is a prototype passive windcatcher system designed to support natural airflow in buildings without fan electricity, with planned testing, certification and serial-production preparation for public and private facilities.

Funding required
112 тис. євро
Source target term
24 months
Open project dossier
Industrial skyline under a transparent data canopy with fixed, mobile, satellite and drone monitoring points.
Startups & innovationIn preparation

ecodome

EcoDome — Air-Quality Intelligence

EcoDome is a preliminary air-quality monitoring concept combining fixed and mobile sensors, satellite observations, drones and voluntary symptom reports; measurement quality, calibration, privacy, response protocols and business assumptions remain unvalidated.

Funding required
435.9 тис Євро
Source target term
12 months
Open project dossier
Agglomeration map linking municipal, education, business and civil-society nodes to European programme pathways.
OtherIn delivery

EUoffice

European Integration Office

The planned office would coordinate EU programmes, international partnerships, grant preparation and institutional learning for Kryvyi Rih and partner communities, creating a structured project pipeline rather than guaranteeing external funding.

Funding required
232 тис. євро
Source target term
12 months
Open project dossier
Isometric public atrium with distinct everyday, accessible and emergency routes across several floors.
Startups & innovationIn delivery

FindNGo

FindNGo — Indoor Wayfinding

FindNGo is an MVP-stage indoor wayfinding concept combining offline-capable navigation, accessible route planning and emergency information for complex buildings; positioning accuracy, safety integration and privacy controls still require validation.

Funding required
45 тис. євро
Source target term
24 months
Open project dossier
Conceptual quarry section showing heavy masses raised with surplus electricity and lowered to return energy to the grid.
Startups & innovationIn delivery

Gravic-Acc

Gravic-Acc — Quarry Gravity Storage

Gravic-Acc is an early concept for storing electricity by lifting and lowering masses in disused quarries; site selection, geotechnical feasibility, capacity, efficiency, safety, permitting and economics still require independent validation.

Funding required
14 тис. євро
Source target term
30 months
Open project dossier
Editorial hero for “Right-Sized, Efficient Boiler Houses”: infrastructure, people and the project’s core technical intervention, without implying that the project is complete.
Energy efficiencyIn preparation

kotelni

Right-Sized, Efficient Boiler Houses

Modern boilers, variable-speed pumps, water treatment, electrics and controls would align selected plants with real heat demand.

Funding required
26,056 млн Євро
Source target term
18 months
Open project dossier
Exploded hospital campus with water, heating, solar battery, insulated-envelope and medical-equipment layers.
InfrastructureIn preparation

Likarni

Resilient Hospital Modernisation

The preliminary programme would modernise water, heat, solar-plus-storage, building envelopes and medical equipment across eight hospitals; facility-level designs, baselines, autonomy calculations, procurement plans and the full budget reconciliation remain outstanding.

Funding required
20 млн 15 тис. Євро
Source target term
12 months
Open project dossier
Editorial hero for “Karachuniv Reservoir Trunk Main”: infrastructure, people and the project’s core technical intervention, without implying that the project is complete.
InfrastructureIn delivery

PAM

Karachuniv Reservoir Trunk Main

A 13 km DN1000 main and Western Pumping Station upgrade are designed to add about 25,600 m³/day to northern Kryvyi Rih.

Funding required
14 967 100 євро
Source target term
24 months
Open project dossier
Editorial hero for “0.8 MW Solar Pilot with Honest Economics”: infrastructure, people and the project’s core technical intervention, without implying that the project is complete.
Energy efficiencyIn preparation

project-sun8

0.8 MW Solar Pilot with Honest Economics

A compact solar plant could offset a defined share of daytime utility demand, provided its marginal economics survive sensitivity testing.

Funding required
0,611 млн Євро
Source target term
11 months
Open project dossier
Patient, clinician and family member in a planned rehabilitation courtyard beside the existing hospital building.
InfrastructureIn preparation

rehabilitation

Rehabilitation and Recovery Centre

The planned centre would renovate an existing hospital building for multidisciplinary inpatient and outpatient rehabilitation, with sixty beds and family support; its radon component requires separate clinical, regulatory and radiation-safety justification.

Funding required
4 млн 240 тис. Євро
Source target term
24 months
Open project dossier
Editorial hero for “A Surge-Resilient District-Heating Network”: infrastructure, people and the project’s core technical intervention, without implying that the project is complete.
Energy efficiencyIn preparation

teplopostachannya

A Surge-Resilient District-Heating Network

Pipe renewal, pressure telemetry, hydraulic protection, GIS and backup power would reduce losses and blackout-induced water-hammer damage.

Funding required
35 млн 138 тис. євро
Source target term
12 months
Open project dossier
Veterinary team caring for companion animals in a warm day-and-night clinic scene with diagnostics and owner consultation.
Startups & innovationIn preparation

vetclinic

Kryvyi Rih Veterinary Centre

The preliminary veterinary-centre concept would combine preventive, diagnostic, surgical and emergency care for companion animals with home visits, temporary boarding and owner guidance; location, licensing, staffing, equipment and demand remain unverified.

Funding required
309 тис. Євро
Source target term
3 months
Open project dossier