AFD
Northern Kryvyi Rih Water-Security Complex
A new 83,000 m³/day intake, pumping, treatment and trunk-main system would diversify water supply for about 150,000 people.
- Funding required
- 45 млн євро
- Source target term
- 48 months
AGGLOMERATION PROJECT PORTFOLIO · 2026
Thirty source-grounded investment and development proposals, reframed around their potential value for the Kryvyi Rih agglomeration without changing legal ownership, scope or readiness.
Source snapshot: 24.08.2026 · invest.kr.gov.ua
AFD
A new 83,000 m³/day intake, pumping, treatment and trunk-main system would diversify water supply for about 150,000 people.
AgriLumen
AgriLumen is an MVP-stage SaaS concept combining weather, satellite and market data to express farm risk in financial scenarios; model accuracy, crop coverage, data rights and customer evidence still require validation.
AshCore
A modular process aims to recover metals and mineral fractions from coal ash, but commercial claims depend on pilot yields, purity and safe residues.
biogas-plant
A 1 MWe and 1.9 MWth anaerobic-digestion plant could convert contracted organic streams into power and useful heat.
CatchWind
CatchWind is a prototype passive windcatcher system designed to support natural airflow in buildings without fan electricity, with planned testing, certification and serial-production preparation for public and private facilities.
DIM
Renewing internal heat, water, sewer and electrical networks would bring infrastructure investment to 92,600 residents at building level.
ecodome
EcoDome is a preliminary air-quality monitoring concept combining fixed and mobile sensors, satellite observations, drones and voluntary symptom reports; measurement quality, calibration, privacy, response protocols and business assumptions remain unvalidated.
energovytraty
New pumps, variable-speed drives, valves, automation and 10 kW of solar are designed to cut station electricity use by about 30%.
ESKO
A competitively procured portfolio can finance on-site solar and storage through independently verified savings rather than upfront municipal capital.
EUoffice
The planned office would coordinate EU programmes, international partnerships, grant preparation and institutional learning for Kryvyi Rih and partner communities, creating a structured project pipeline rather than guaranteeing external funding.
FindNGo
FindNGo is an MVP-stage indoor wayfinding concept combining offline-capable navigation, accessible route planning and emergency information for complex buildings; positioning accuracy, safety integration and privacy controls still require validation.
Gravic-Acc
Gravic-Acc is an early concept for storing electricity by lifting and lowering masses in disused quarries; site selection, geotechnical feasibility, capacity, efficiency, safety, permitting and economics still require independent validation.
heat
Air-to-water heat pumps, controls and backup circulation would improve heating resilience for 13 schools and 13 kindergartens.
Hydrogen
A 2 MW PEM electrolyser paired with 4 MW of solar capacity is designed to produce up to 245 tonnes of hydrogen per year.
incubbaza
A 6,270 m² stage-two base would connect laboratory evidence, pilot validation, certification pathways and startup support for industrial-waste solutions.
investing
A 26.03 ha registered park, expandable to 73 ha, is planned around utilities, rail-road access and a 5,000 m² starter complex.
kotelni
Modern boilers, variable-speed pumps, water treatment, electrics and controls would align selected plants with real heat demand.
LAB
Completing the two-level facility would create local capacity to identify asbestos and evaluate safe uses for demolition and industrial waste.
Likarni
The preliminary programme would modernise water, heat, solar-plus-storage, building envelopes and medical equipment across eight hospitals; facility-level designs, baselines, autonomy calculations, procurement plans and the full budget reconciliation remain outstanding.
logistics_kr
A dry, chilled and frozen terminal would connect agglomeration producers and businesses with national supply corridors.
PAM
A 13 km DN1000 main and Western Pumping Station upgrade are designed to add about 25,600 m³/day to northern Kryvyi Rih.
project-sun12
A six-block 12 MW solar plant could offset water-utility demand and export verified surplus under an approved grid and offtake model.
project-sun8
A compact solar plant could offset a defined share of daytime utility demand, provided its marginal economics survive sensitivity testing.
RDF
A 20 MW thermal plant could produce up to 120,000 Gcal a year from specified residual fuel, subject to lawful supply, BAT cleaning and safe ash management.
rehabilitation
The planned centre would renovate an existing hospital building for multidisciplinary inpatient and outpatient rehabilitation, with sixty beds and family support; its radon component requires separate clinical, regulatory and radiation-safety justification.
SPP on CEHN
A distributed PV and battery portfolio is designed to generate more than 11.9 GWh a year for boiler-house loads.
SPP on KVK
Distributed solar and high-capacity batteries would reduce grid purchases and support priority pumping loads serving 434,563 consumers.
teplopostachannya
Pipe renewal, pressure telemetry, hydraulic protection, GIS and backup power would reduce losses and blackout-induced water-hammer damage.
vetclinic
The preliminary veterinary-centre concept would combine preventive, diagnostic, surgical and emergency care for companion animals with home visits, temporary boarding and owner guidance; location, licensing, staffing, equipment and demand remain unverified.
vodopostachannya
Replacing 4 km of failure-prone pipe and adding surge valves and pressure telemetry would reduce bursts and losses for 124,000 residents.
No projects match these filters.