Exploded hospital campus with water, heating, solar battery, insulated-envelope and medical-equipment layers.
InfrastructureIn preparation

Source project ID · Likarni

Resilient Hospital Modernisation

The preliminary programme would modernise water, heat, solar-plus-storage, building envelopes and medical equipment across eight hospitals; facility-level designs, baselines, autonomy calculations, procurement plans and the full budget reconciliation remain outstanding.

Contact for this project

01

Agglomeration relevance

Cluster and general hospitals may serve a wider territorial catchment; the source does not quantify communities, patients or formal agglomeration coverage.
This section is an editorial assessment of functional relevance. It does not change the project owner, beneficiary area or governance stated by the source.

02

Project dossier

The project in operational terms: the system it changes, the intervention logic, the path to delivery and the evidence still required for a responsible commitment.

01

The system behind the project

The preliminary programme covers eight hospitals facing ageing internal systems, water risk and power interruption. It is not one building refurbishment: hospitals must continue clinical work while water, heat, envelope, energy and medical-equipment interventions are coordinated around infection control and patient safety. The source states a programme budget and twelve-month target but leaves the scope and readiness of each facility unresolved. The eight hospitals could potentially serve a wider agglomeration catchment, but the source confirms no referral agreements, service entitlements or coverage beyond the city; formal responsibility remains with the named city bodies.

02

How the intervention works

Each hospital needs an integrated resilience plan covering internal water and wastewater, heat distribution, envelope defects, solar generation with correctly sized storage, essential electrical circuits and specified clinical equipment. Critical loads must be separated from comfort loads, with protected power, water reserves and safe shutdown sequences defined by department. Building works require clean and dirty routes, dust containment and temporary clinical zoning. A common asset register, metering scheme and maintenance standard should connect all eight facilities, while technical designs remain specific to their services, condition and risk profile.

03

From concept to an operable asset

Begin with facility audits led jointly by clinical, infection-control and engineering teams, then rank interventions by life safety and service continuity. Package enabling works before installing equipment that depends on stable rooms, water, heat or power. Construction should proceed by isolated zones with documented temporary pathways for patients, staff, sterile materials and emergencies. Commission every system under realistic load, train hospital technicians and hand over maintainable records. The twelve-month target must be tested against procurement lead times and seasonal constraints; unverified sites should not be forced into a single artificial completion date.

04

What must be proven before commitment

Before approval, confirm the eight facilities, room-by-room condition, clinical priorities, utility baselines, critical-load schedules, water autonomy assumptions and the exact medical-equipment list. The stated budget requires reconciliation into design, construction, equipment, temporary services, contingencies and taxes. Verify permits, radiation or medical-device requirements where applicable, infection-control plans, grid and roof studies for solar systems, battery fire safety, maintenance capacity and procurement lead times. Decision-makers need facility-level outcomes and commissioning tests, not a pooled programme total that hides unequal readiness or unresolved clinical dependencies.

05

Where a partner can create value

The programme needs hospital architects and engineers experienced in occupied-facility renovation, infection prevention, medical gases, electrical resilience, water hygiene and building controls. Clinical-equipment suppliers must provide regulatory documentation, installation qualification, staff training, service response and consumables planning. Solar and storage partners need healthcare load modelling and battery fire-safety competence. Independent commissioning, cost management and construction supervision should protect continuity and value. Partners must coordinate with clinical leadership, sequence work around care, document temporary risk controls and avoid claiming hospital autonomy unless tested duration and supported loads are explicitly proven.

03

How the project creates value

  1. NeedHospitals face ageing systems, water risks and power interruptions.
  2. InterventionUpgrade five infrastructure and clinical-equipment systems across selected facilities.
  3. OutputsRenewed networks, backup capacity, thermal upgrades and medical equipment.
  4. BeneficiariesPatients, clinical teams and communities using the hospital network.
  5. Expected resultLower disruption risk and potentially more efficient, reliable care environments.

04

Evidence dashboard

Hospitals8Source fact
Budget€20.015MSource total
WorkstreamsWater · heat · PVSource fact
Card statusPreparationSource fact

European value lens

Supports equitable access, patient safety, solidarity, resource efficiency and continuity of essential care without promising uninterrupted operation.

05

Source identity and readiness

Customer
initiated by Kryvyi Rih City Council
Performer
Kryvyi Rih City Development Institution
Project year
2025
Readiness
preliminary development
Funding required
20 mln 15 thou. EUR
Source target term
1 year
Detail status
Active

06

Project context from the source

Optimised derivatives of the source project imagery; each asset retains its provenance.

07

Contact for this project

Support the next verified step of this project with technology, expertise, finance or partnership capacity.

This site collects no messages and stores no personal data. The button opens the original project page on the regional investment portal in a new tab, where the responsible team and its contact details are published.

Source captured and verified on 24 August 2026

Open original project page ↗